For wireless products to enter the Japanese market, Janpan Telecom's model approval is required (mainly for the RF part). Now Dray Lab can complete such test certification. The TELEC certification process requires the submission of materials and WLAN, Bluetooth test certification.
application process:
(1) Customer: Submit the application form to the laboratory, prepare samples, sign the contract and pay the advance payment.
(2) Delai Shenzhen Laboratory: test and report, preliminary review of data, time: 2 weeks.
(3) Japanese MIC institution: final review and certification, and the customer pays the final payment. Time: 1-2 weeks.
Application information:
1. System block diagram
2. Block diagram of the whole machine (System schematic)
3. User manual
4. Operational description (operational description)
5. BOM
6. Module schematic diagram (module schematic)
7. Module block diagram
8. Module specification
9. Factory ISO9001 certificate (ISO 9001 certificate of manufacturer)
10.label and location map (label location and label sample Drawing or photos)
11. Antenna specification (antenna specification): including antenna name, antenna form, antenna
Large gain, antenna measurement chart, antenna appearance and size chart.
TELEC certification scope:
1.2.4G products
2. Bluetooth products
3.wifi products
4. RFID products
TELEC certification cycle:
1. The customer submits the application form to the laboratory, prepares the samples, signs the contract and pays the prepayment.
2. The test and report of the test laboratory of Lexun, preliminary review of data, time: 2 weeks.
3. The Japanese MIC institution finally audits and issues the certificate, and the customer pays the final payment. Time: 1-2 weeks